2266998 发表于 2021-9-5 20:23:36

你那可怜的小薪水是怎么被阻挡在天花板下面的,

你看苹果公司,许多大侉子是拿固定薪水的,没有期权,没有股票,有人没有奖金,涡糙,看薪水数,吓死你,由此一个问题,他薪水怎么长上去的呢?

国内,经常讨论那个‘老板不给’,比如到3500,老板就不给了,有人断言,机械难以突破一万,你不突破一万,就见不到10000卡,对吗?

薪水是怎么被阻住的?就是硬卡那里了,上不去了,你琢磨过吗?阿拉喜欢举例,说实际玩过的例子,阿拉这个臭毛病毕生携带了,类似病毒,是不是就传播出来了,无法反驳,反正,读书干活,都是伤天害理,丧尽天良,哈哈,这个论调有出处的,阿拉还保留呢,

好了,说具体例子,比如高炉的热风炉,本质说,就是一个大的蓄热器,里面有许多耐火砖,先烧这些耐火砖,不是烧热了吗?就先不烧了,通空气,进高炉,这样,空气就是热的了,温度越高,自然各个方面越省啊!哈哈,省下的是钱啊!焦炭多贵啊!哈,

这东西是不是必须阿拉先玩一次,才能开口吹牛逼啊?不是啊!要那样,人家不给阿拉先玩,不是一辈子都不能吹牛逼了吗?那多可怜啊!这样,收入就被阻挡了,呜呼也!

实际情况,一定是阿拉先能吹牛逼,后面人家才给活干,对吧!

这东西是个啥呢?一个大钢筒子,大的一个就有1000吨,一套用四个,下面就吹牛逼怎么烧热了?高炉煤气,有燃烧器,助燃客气,送进来,烧!

玩钢铁的,许多孙子都知道这个,耐火砖不行,进口啊!燃烧器,进口啊!最终,他们都触电而亡,死在哪里了?就是不敢侃燃烧过程中的振动,你泛泛想,燃烧振动啥啊?你家煤气炉子,不振啊!哈哈,因为现在天然气热值高,稳定,你火焰区域小,早年家用热水器也响,不厉害,但响啊!

问题引回燃烧了,热风炉很高,几十米,煤气热值很低,700多大卡,形成‘管束’,就是有些没有完全烧完的一氧化碳,被携裹走了,走一阵,携裹不稳定了,露出来又烧一下,哈哈,震荡波传回,哈哈,

你侃到阿拉这里,不需要再深了,吹牛逼到这,银子就到了,挡不住你了,你被挡住,是因为人家问啥,你都说不知道,哈哈,

问你,炉壳!你说,不知道,燃烧器!不知道,砖,不知道,世界谁玩的好?不知道,霍戈文是哪国公司?不知道,无论啥,不知道,那怎么给钱啊?

阿拉告诉你,给你钱,一定是那个东西大家都说‘不知道!不会!’才给你的,否则,中国这么多人,一个公司50万人,就那点钱,你去抢?你打得过其它孙子吗?

于是,没有你的,一辈子,你就那几块钱,老板不给,没错,一辈子也不给你,哈哈,


changkongceyi 发表于 2021-9-5 23:35:41

卖人家部门的货就得比人家专业...
人家介绍产品的时候就那个产品的单页...
小土打开屁屁踢,就哇啦哇啦讲客户的产品...
竞品存在的各种问题,俺的货是怎么成功轻松解决...
俺的资料是琢磨一年多才写出来的,抱佛脚的能有俺专业?

迷茫的维修 发表于 2021-9-5 20:36:03

本帖最后由 迷茫的维修 于 2021-9-5 20:38 编辑

第一,玩的东西陋,产品没利润,

第二,自己没价值

50201 发表于 2021-9-5 21:26:45

一张老图

ValiantS 发表于 2021-9-5 21:45:21

去年在嘉兴买的房子,当时一万五一平。新政策变动,现在六千九一平。必须想办法弄钱了。

更换弹头 发表于 2021-9-5 22:26:03

   国内生产的感应电炉里面的炉衬材料也是进口的。之前玩过一家感应炉公司,炉衬材料进口联合矿产的,炉衬烧结有专门施工工艺说明书,有一条加热曲线,不同吨位炉子烧结加热曲线还不同。刚进这行业时,看着耐火材料以为没啥,没想到也依赖进口。

Architect 发表于 2021-9-6 09:49:10

https://www.britannica.com/topic/Corus-Group

“Corus Group, international steel and metals manufacturer founded in October 1999 through the merger of British Steel of the United Kingdom and Koninklijke Hoogovens of the Netherlands. It is based in London and operates plants in the Netherlands and the United Kingdom in addition to the United States, Germany, Norway, and France. Corus employs a global workforce of nearly 50,000 in the manufacture and distribution of metals used in a variety of applications including construction, aircraft, consumer appliances, packaging, and industrial equipment. It also provides technical support in design and engineering. In April 2007 Corus was acquired by Tata Steel of India. (See Tata family.)”

Architect 发表于 2021-9-6 09:51:54

https://cordis.europa.eu/project/id/EE.-00014-80

FLUE GAS UTILISATION IN THE HOT BLAST STOVES OF A BLAST FURNACE

“To recover the energy contained in flue gases discharged when hot blast stoves are in operation. Flue gas temperature is about 275 C while the stoves heat up to 1,450 C. The heat in the flue gas is to be recovered by means of a modern rotary regenerator used to preheat the combustion air to approximately 250 C before it enters to hot blast stoves. Calculations indicate a probable energy saving of about 103,000 TOE/yr, at project level.
The system was put in operation on May 16th, 1984. Three problems - which did not interfere with the efficiency of the system - were encountered : vibrations of fans and ducting, leakage of waste gas and difficulties when changing the compensator bellows. These problems are partially solved now and will be fully solved in 1990 during the repair of blast furnace. Measurements during the period July 1984 to June 1985 show that although the installation runs actually at 90 % of design value, it is already achieving the forecast savings of 430.000 GJ/yr.
The aim is therefore attained. Licences are available.
Vibrations of fans and ducting occurred also before the installation of the rotary regeneration. In fact the problems were more serious since the vibrations were tranmitted to the burners and the host blast stoves and contributed to vibrations in the stoves itselves.
After installation of the rotary regenerator, hot stove vibrations were no longer a serious problem since the rotary regenerator acts as a damper between the fans and the stoves. Vibrations before the rotary regenerator still occur.
Heavy fan bearings are installed now and exchanged every year as preventive measure.
During the renovation of the blast furnace it is planned to exchange the fans by another type.
Energy saving in hot blast stoves stet already benefited from a number of measures i.e. optimisation of blast operation, improvement of the burners, reduction in the use of high calorific coke gas or natural gas.
It is now attempted to recover the heat contained in the flue gases generated during the heating of hot blast stoves and to use this energy the preheating of the combustion air for the hot blast stove. It is planned to use a rotary regenerator for this purpose.
The system should enable the preheating of the combustion air to approximately 250 C and to simultaneously cool the flue gases to about 125 C. The regenerator consists of a stator with heating surfaces and with tightly-fitting rotating hoods at the top and at the bottom, housing the nozzles for waste gas, air inlet and air outlet.
The regenerator is fed in counter-current and the rotating speed of the hoods is 0.8 RPM.
As the regenerator rotates, gas and air are alternatively supplied to specified segments of the regenerator, i.e. the areas heated by the gas are cyclically unloaded again by the air.”

山东土狗 发表于 2021-9-7 14:11:57

一直是机械散热的一个小侉子毕业年薪2000 跳槽过10000再跳过20000 又跳过40000年薪百万真的不可能吗

肥膘 发表于 2021-9-7 14:33:11

apple 的local 侉子工资还是满高的,要抗得住操,去驻厂当大爷供。
页: [1]
查看完整版本: 你那可怜的小薪水是怎么被阻挡在天花板下面的,